TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
052714,A1074
Item Numbers:
# Qty. Part # Description
1 2 43766A Guide Tube Assembly
2 8 10645 Nylock Nut 1/2”
3 8 10527 Washer 1/2” zinc
4 4 84478-1Z U-bolt 1/2”x 2” x 3”
Installation Instructions
1. Place the Guide Tube Assembly (1) in place over the
crossbeam, check for correct positioning to
the pontoon.
2. Place u-bolts (4) under the frame and thru the
Guide Tube base. Loosely attach washers (3)
and nylock nuts (2).
3. Make sure the guide tube is properly seated flat
againest the crossbeam and in a 90 degree angle.
4. Double check Guide Tube and pontoon position.
5. Tighten the u-bolts.
High Impact Pontoon
Trailer Guide On’s
Model #86467
1.
2.
3.
4.
Instruction Sheet #08119
• Hot dip galvanized steel tubing
• Fits over 2”W x 2H” & 2”Wx 3“H tubes
• Fits over cross members
Comments to this Manuals